We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method×東京テクノ - List of Manufacturers, Suppliers, Companies and Products

Construction method Product List

1~15 item / All 22 items

Displayed results

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology)  BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introduction to the case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Subsurface Obstacles March Part 2

Introducing actual underground obstacles! We have a proven track record in various situational sites.

On our website, we introduce case studies of underground obstacle removal. This page features the second installment of our special on underground obstacles removed in March 2022. For more details, please check the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Nihonbashi, Chuo-ku, Tokyo T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method was implemented in a strict and narrow space to improve φ1000!

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction example of ground column improvement work with a pile diameter of Φ160 at 3 locations, totaling 170 piles!

We would like to introduce a case study of the ground improvement work carried out by our company. In Machida City, Tokyo, the columnar improvement work for the newly constructed Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical review certification and is a deep mixing treatment method. This project involves columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement Using Deep Mixing Treatment Method (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa-cho, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of the ground improvement work we conducted. In a factory located in Odawara City, Kanagawa Prefecture, we implemented our original deep mixing treatment method, the T-column method (Construction Technology Examination Certificate). We have provided images and details of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-Column Method in Odawara City, Kanagawa Prefecture ■ Construction Date: September 30, 2021 ■ Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation length was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Multi-Drill Method Equivalent to BG Method

Select from various construction machines!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Tokyo, we carried out construction using a multi-drill method equivalent to the BG method. We removed PHC piles and pine piles with a diameter of 1500 mm and a length of 22 m. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Multi-Drill Method Equivalent to BG Method ■ Construction Date: June 10, 2022 ■ Location: Tokyo ■ Details: Diameter 1500 mm, Length 22 m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were removed using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【施工事例】マルチドリル工法による壁際地中障害撤去

いろいろな地質、地中障害物に対応!壁に接近した施工が可能な事例

当社で行った地中障害撤去の施工事例をご紹介いたします。 東京都大田区にて、マルチドリル工法(BG工法同等)による 壁際地中障害撤去を実施。周辺への影響が少ないので、壁に 接近した施工が可能です。 関連リンクにて、画像付きで本事例をご紹介しておりますので 是非ご覧ください。 【事例概要】 ■工事名:マルチドリル工法(BG工法同等)による壁際地中障害撤去 ■施工日:2022年04月08日 ■所在地:東京都大田区 ■詳細:φ1000、L=2.3m(52本) ※詳しくは関連リンクからPDFダウンロードいただくか、お問い合わせ下さい。

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles that were removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work

Lifted using the multi-drill method! A case of removing obstacles made of hard machi stone.

We would like to introduce a case of underground obstacle removal that we conducted. In a site adjacent to the Shuto Expressway in Chuo Ward, Tokyo, we removed a hard block of rubble that had been left under the old revetment. Using the multi-drill excavator SR-45, which has the capability to remove obstacles even in adjacent areas, we lifted the rubble using the multi-drill method. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in Chuo Ward, Tokyo ■ Construction Date: October 12, 2020 ■ Location: Nihonbashi Hamacho, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration